TB5400 Power Package Renovation & Project Sale – Nigeria

Gas Turbine Resources completes an equipment and project sale to NNPC as joint stake holders together with Shell Petroleum to supply a fully overhauled zero hour rated Siemens TB5400 prime mover to facilitate a recovery and life extension of GT1 machine located at Shell Petroleum and Development Edjeba Training base.

The works included contract preparation, project guidance and project programs. Preparation, build and shipment of specially prepared gas turbine prime mover, comprising gas producer, power turbine and speed reduction gearbox.

Delivery of a GTR prepared comprehensive tooling container and additional spare parts supply to provide the equipment resources as required on site to facilitate the project. Works included refurbishment of all turbine package fluid systems, control systems repairs and reinstatement, supervision of alternator refurbishment and commissioning activities.

TB5400 & Parts, shipping from UK to Nigeria
As found power package condition, existing failed engine removed, ready for refurbishment and new core engine installation
Arrival in Nigeria, unpackaging GTR Bespoke sea freight cargo protective crates
TB5400 Gas producer ready for installation
Finished installation, ready for commissioning of power plant